Mortar Calculator
Estimate masonry mortar for a brick or concrete block wall — straight from wall dimensions, without needing to already know your brick or block count.
Your Project
Masonry type
A brick can be treated as solid for estimating, so mortar is calculated geometrically: the module cell (brick plus joint) minus the solid brick itself, summed across every brick in the wall.
Your Walls
Add a wall for each section. Add openings (doors, windows) inside a wall to deduct them — give an opening a quantity if several identical ones repeat.
Wall 01 of 01
Specified: 7.625 × 2.25 × 3.625 in (L × H × D) — always verify against your own product.
Mortar joint
Used for both the horizontal (bed) and vertical (head) joint.
BIA Technical Note 10 suggests roughly 15–25% for field use — 20% is the midpoint, not a universal requirement.
Need to know how many bricks to buy? Use the Brick Calculator for brick quantity, packages and brick-focused planning.
Advanced options
Premixed mortar bags
Optional. Choose a sourced manufacturer coverage figure, or enter your own product's published yield/coverage.
Cost estimate
Entirely optional — no price is pre-filled. Material estimate only; excludes labor, delivery, taxes and other charges.
Your Estimate
Enter your wall dimensions and masonry unit to see your mortar estimate.
How It's Calculated
Methodology
Enter your wall dimensions and masonry unit to see the formula breakdown.
Assumptions & Accuracy
Brick mortar uses a geometric estimate — the module cell (brick plus joint) minus the solid brick itself, from Brick Industry Association Technical Note 10's wall-area method — labeled as a theoretical/calculated joint volume, not a purchase-ready prediction. Concrete block (CMU) mortar never uses a wall-volume-minus-block-volume calculation, since hollow cores are not mortar-filled; it derives a continuous block count from your wall dimensions and applies a verified manufacturer units-per-bag (or ft³-per-bag) coverage figure. Optional bag coverage and prices use the values you enter — no universal defaults are assumed for them.
Material estimate only. This calculator does not specify a mortar type (N, S, M, O), a cement-lime-sand mix ratio, grout or core fill, structural design, wall thickness, or code compliance. Follow project drawings, manufacturer instructions, mortar specifications, and applicable building requirements.
Project Guide
How to measure a wall for mortar
Measure the length and height of each wall section and let the calculator find the gross area. Add doors, windows, or other openings inside their wall with a width, height, and quantity — the calculator deducts them automatically before totaling every section's net area.
Why brick and concrete block use different mortar methods
A brick is close enough to a solid rectangular block that its mortar joints can be calculated geometrically: the space one brick's share of wall (its “module”) occupies, minus the brick itself, is the joint void mortar fills. A concrete block is hollow. Applying that same subtraction to a CMU wall would treat the block's open cores as if they were filled with mortar, wildly overstating the true requirement. Because the physical shape of the two materials is fundamentally different, this calculator never blends them into one formula — see the next two sections for how each one actually works.
How the brick mortar estimate works
The brick's specified length and height, plus your mortar joint, form a “face module” — the footprint one brick and its share of mortar occupy on the wall. Net wall area divided by the module area gives a calculated brick count. For each of those bricks, the calculator finds the module cell's volume (module length × module height × brick depth) and subtracts the solid brick's own volume (brick length × brick height × brick depth); the difference is the geometric mortar void for one brick. Summed across every brick, this is the theoretical/calculated joint volume — then a field-use allowance is applied to reach an order volume.
Why the brick allowance defaults to 20%
BIA Technical Note 10 (p. 11) advises adding roughly 15 to 25 percent to net mortar quantities for field use. 20% is the midpoint of that published range, matching the Brick Calculator's own existing mortar estimate — it is a reasonable starting point, not a value this calculator claims is universally correct. Adjust it for your crew, mix, and site conditions.
How the concrete block (CMU) mortar estimate works
Concrete block mortar is never estimated as wall volume minus block volume — a hollow block's cores would be miscounted as mortar-filled space. Instead, the calculator finds a continuous block count the same way as brick (net wall area ÷ the block's nominal face module area — the nominal module already includes the mortar joint), applies your additional allowance, and stops there. Turning that block count into a bag count relies entirely on a verified manufacturer units-per-bag (or, for some products, ft³-per-bag) coverage figure, not on any independently calculated CMU mortar volume.
Why the CMU allowance defaults to 0%, unlike brick's 20%
Published block-mortar coverage figures (bricks/blocks or ft³ per bag) already come from real product testing, and may already build in a nominal allowance for normal waste. There is no sufficiently explicit authoritative source supporting a universal additional percentage on top of that — so this calculator defaults the CMU additional allowance to 0%, fully editable, rather than assuming a figure it cannot verify. Add a project-specific contingency here only if you want one; brick's 20% default comes from a specific, citable source (BIA TN10) for a genuinely different, geometrically-derived quantity.
Volume yield vs. unit coverage — two different kinds of bag data
Manufacturers publish premixed mortar coverage in two different, non-interchangeable ways: a mixed volume yield per bag (cubic feet), or a unit coverage per bag (how many bricks or blocks one bag will lay). Some products publish only one; a few publish both. This calculator never converts one into the other — a bag count is always computed from whichever figure your selected or entered coverage actually published.
What this calculator does not do
- Recommend a mortar type (Type N, S, M, or O) or mix ratio.
- Calculate cement, lime, or sand quantities for a site-mixed batch.
- Estimate grout or core fill for reinforced CMU cells.
- Model multi-wythe walls — this calculator is single-wythe only.
- Design structural capacity, reinforcement, or wall thickness.
- Include labor, delivery, taxes, or other installed costs.
Follow your project drawings, mortar specification, manufacturer instructions, and a qualified professional for all of the above — this calculator estimates mortar material quantity only.
Worked Examples
Illustrative values only — enter your own project's dimensions above for a real estimate.
Example 01
10 ft × 8 ft brick wall, US Modular brick, ⅜ in mortar joint, 20% field-use allowance, QUIKRETE Mortar Mix (37 brick/bag).
Inputs
- Wall: 10 ft × 8 ft (80 ft² gross, no openings)
- Brick: US Modular, 7.625 × 2.25 × 3.625 in specified
- Mortar joint: 0.375 in (bed and head)
- Field-use allowance: 20%
- Bag coverage: QUIKRETE Mortar Mix, 37 brick/bag
Calculation
- Face module: (7.625 + 0.375) × (2.25 + 0.375) = 8 × 2.625 in
- Calculated bricks: 80 ÷ 0.145833 = 548.571429
- Mortar per brick: (8 × 2.625 × 3.625) − (7.625 × 2.25 × 3.625) = 13.93 in³
- Theoretical joint volume: 13.93 × 548.571429 ÷ 1728 = 4.42 ft³
- Order volume: 4.42 × 1.20 = 5.31 ft³ (0.20 yd³)
- Adjusted brick count for bags: 548.571429 × 1.20 = 658.29
- Bags: 658.29 ÷ 37 = 17.79 → round up → 18 bags
Result
Practical interpretation
Example 02
10 ft × 8 ft concrete block wall, 8×8×16 in nominal block, 0% additional allowance, QUIKRETE Mortar Mix (13 block/bag).
Inputs
- Wall: 10 ft × 8 ft (80 ft² gross, no openings)
- Block: 8 × 8 × 16 in nominal (16 × 8 in face module, joint-inclusive)
- Additional allowance: 0%
- Bag coverage: QUIKRETE Mortar Mix, 13 block/bag
Calculation
- Block face module area: (16 × 8) ÷ 144 = 0.8889 ft²
- Calculated blocks: 80 ÷ 0.8889 = 90.00
- Adjusted coverage basis: 90.00 × (1 + 0%) = 90.00
- Bags: 90.00 ÷ 13 = 6.92 → round up → 7 bags
Result
Practical interpretation