Brick Calculator

Estimate the bricks, mortar, and cost for a wall — with openings deducted, waste applied, and the full formula breakdown shown.

Your Project

Rectangular wall viewed from the front, with length and height labeled, and one example opening with its own width and height labeledOpening widthOpening heightHeightLength
Wall area = length × height, minus every opening's width × height × quantity.
One brick's face, length by height, with its depth shown as a separate informational strip and the head and bed mortar joints shown as separate hatched strips outside the brick's own outline, not part of the brick's sizeBrick faceLength (L)Height (H)Head jointBed jointDepth (D) — informational only
Mortar joints are added on top of the brick's own length and height — never baked into the brick's specified size.

Walls

Add a wall for each rectangular section. Add openings (doors, windows) inside a wall to deduct them — give an opening a quantity if several identical ones repeat.

Wall 01 of 01

ft
ft
Specified length7.625 in
Specified height2.25 in
Specified depth3.625 in · informational

Specified (actual/physical) dimensions from BIA Technical Note 10's ⅜ in. mortar-joint convention — the industry-typical figures, though BIA itself publishes these as a range that varies by manufacturer. Always verify against your own product, especially for Queen and King: the same name can mean a noticeably different size depending on manufacturer or region.

Mortar joint

in

Used for both the horizontal (bed) and vertical (head) joint — added on top of the brick's own size, never included in it.

Wall construction

Two wythes doubles the base brick quantity for two independent skins. A bonded multi-wythe wall — where header courses tie the wythes together — can need a different quantity than this simple ×2 estimate.

Bond / layout

Running and stack bond use the standard wall-area method as-is.

%

An editable ordering allowance for cuts, breakage, and project variation — not a universally correct figure.

Advanced options
Packages / pallets

Optional. Package/pallet quantity varies by manufacturer and product — there's no universal package or pallet size.

From your supplier's packaging — not a standard quantity.

Estimate mortar

An approximate geometric estimate — the mortar-sized volume around each brick, times the calculated brick count before waste. It does not model frogs, perforations, header-bond cross joints, or collar joints between wythes, and it does not prescribe a mortar type, mix ratio, or water requirement.

%

BIA guidance suggests roughly 15–25% for waste and spillage — not a universally required figure.

ft³/bag

From your mortar product's stated mixed yield — never inferred from bag weight.

Want a more detailed mortar breakdown, including manufacturer bag coverage options? Use the Mortar Calculator.

Cost estimate

Entirely optional — no price is pre-filled. Estimated material cost only; excludes labor, delivery, scaffolding, equipment, taxes, and permits.

$
$

When entered, package/pallet pricing replaces price-per-brick pricing — the two are never added together.

$

Your Estimate

Enter your wall dimensions and brick size to see your brick estimate.

How It's Calculated

Methodology

Enter your wall dimensions and brick size to see the formula breakdown.

Assumptions & Accuracy

Brick quantity uses the wall-area method from Brick Industry Association Technical Note 10: each brick's specified (actual/physical) dimensions plus your entered mortar joint determine the face module, and net wall area is divided by that module. Running and stack bond use this model as-is. Optional packages, mortar, and prices use the values you enter — no universal defaults are assumed for them.

Material estimate only. This calculator does not determine structural wall thickness, reinforcement, lintels, wall ties, foundations, mortar specification, movement joints, or code compliance. Follow project drawings, manufacturer instructions, and applicable building requirements.

Project Guide

How to measure a brick wall

Measure the length and height of each wall face and multiply them for its gross area. For an irregular building outline, divide it into rectangular wall sections and add them separately — the calculator sums their areas automatically before any rounding happens.

How doors and windows are deducted

Add each opening's width and height inside its wall, plus a quantity if the same opening repeats (e.g. four identical windows). The calculator multiplies width × height × quantity and subtracts the total from that wall's gross area — a wall can have any number of openings.

Specified vs. nominal brick dimensions

“Specified” (or actual/physical) dimensions are the brick's real measured size. “Nominal” dimensions, used by some other masonry units, already include an assumed mortar joint baked into the number. This calculator always works from specified dimensions and adds the mortar joint separately, so it never double-counts or omits the joint the way mixing the two conventions would.

Tip: Brick names (Modular, Standard, Norman, Queen, King, Utility) are common industry terms, but exact sizes vary by manufacturer — always check your own product's specification sheet, especially for Queen and King brick.

Why you should check your actual product's dimensions

Even within one named size, manufacturers vary slightly in the brick they actually produce. A small dimensional difference compounds across hundreds or thousands of bricks, so for anything beyond a rough estimate, measure or look up your specific product's specified dimensions rather than relying on a preset alone.

How the mortar joint changes brick count

The joint is added to the brick's own length and height to form the “face module” — the space one brick plus its share of mortar actually occupies on the wall. A larger joint means a larger module, which means fewer bricks (and more mortar) cover the same wall area; a smaller joint means more bricks and less mortar. This is why the joint is always an editable, visible input rather than a hidden constant.

Running bond vs. stack bond

Running bond (each course offset by a half-brick) and stack bond (bricks aligned directly above one another) both use the same brick quantity as this calculator's standard wall-area method — offsetting the pattern doesn't change how much of the wall face a single brick covers.

Why header-containing bonds need different quantities

Bonds that include header courses — bricks turned to show their end face, as in English or Flemish bond — use some bricks differently than a simple running-bond face, which changes both brick and mortar quantities. BIA publishes correction factors for specific header-bond patterns, but they come with applicability conditions tied to particular brick proportions and wall construction that this calculator cannot verify are met for your project. Rather than silently apply a factor that might not fit your brick, selecting “Other / header bond” shows a note instead of a number, and you should adjust the estimate using your bond's specific layout or your mason's guidance.

Single wythe vs. two wythes (double skin)

A wythe is one continuous vertical layer of brick. “Single wythe” uses the standard wall-area quantity as-is; “two wythes” doubles it, for two independent layers. A real two-wythe wall is often tied together with header courses or wall ties bonding the wythes — which, similar to a header bond, can need a different quantity than this simple ×2 estimate. This calculator does not design or recommend a wall thickness; it only scales the brick quantity for the construction you tell it to assume.

Why a waste allowance is added

Waste allowance is a separate ordering contingency for cuts, breakage, and project variation — it is applied to the calculated brick count before the final purchase round-up. 5% is an editable, commonly used starting point, not a universally correct figure; more complex cuts or a less experienced crew may warrant more.

Why the mortar estimate is approximate

The mortar figure here is a simplified geometric estimate: it treats each brick as a solid block and measures the mortar-sized gap the joint leaves around it. Real mortar use also depends on frogs (indentations) or perforations in the brick, header-bond cross joints, collar joints between wythes, and bedding technique — none of which this calculator models. Treat it as a starting point, not a final order quantity, and adjust with your mason's experience or your product's own coverage data.

Why manufacturer bag yield beats a weight-based guess

Bagged mortar mix yield (how much mixed mortar volume one bag produces) depends on the product's formulation and mix water — not just the bag's weight. Two 80 lb bags from different manufacturers can yield different mixed volumes. Enter your product's stated mixed yield to get an accurate bag count; this calculator never infers yield from bag weight.

What this calculator does not design

  • Structural wall thickness or load-bearing capacity.
  • Reinforcement, wall ties, or lintels over openings.
  • Foundations or footings.
  • Mortar type, strength, or mix ratio.
  • Movement joints or expansion joint spacing.
  • Building code or local requirement compliance.
  • Bond correction factors for header-containing bonds (see above).

Follow your project drawings, manufacturer instructions, and a qualified professional for all of the above — this calculator estimates material quantity only.

Worked Example

Illustrative values only — enter your own project's dimensions above for a real estimate.

Example

6 m × 2.4 m wall with a 0.9 m × 2.1 m door, UK Standard brick, 10 mm mortar joint, 5% waste allowance.

Inputs

  • Wall: 6 m × 2.4 m
  • Door: 0.9 m × 2.1 m, quantity 1
  • Brick: UK Standard, 215 × 65 × 102.5 mm specified
  • Mortar joint: 10 mm (bed and head)
  • Wall construction: single wythe
  • Waste allowance: 5%

Calculation

  • Gross area: 6 × 2.4 = 14.4 m²
  • Opening: 0.9 × 2.1 × 1 = 1.89 m²
  • Net area: 14.4 − 1.89 = 12.51 m²
  • Face module: (215 + 10) × (65 + 10) = 225 × 75 mm
  • Brick rate: 1,000,000 ÷ (225 × 75) = 59.259259 bricks/m²
  • Calculated bricks: 12.51 × 59.259259 = 741.333333
  • With 5% waste: 741.333333 × 1.05 = 778.4
  • Bricks to buy: round up → 779

Result

779 bricks to buy, including 5% waste.

Practical interpretation

The mortar joint (10 mm here) is added on top of the brick's own 215 × 65 mm face, not baked into it — changing the joint changes this result without touching the brick size.

FAQ

How many bricks do I need for a wall?
Divide your wall's net area (gross area minus openings) by the brick's face module area — the brick's specified length and height plus your mortar joint. This calculator does that automatically once you enter your wall dimensions and brick size, applying your waste allowance and rounding up to a whole brick.
How many bricks per square foot (or square meter)?
It depends on both the brick's specified size and the mortar joint you use — there's no single universal figure. For example, a UK Standard brick (215 × 65 mm) with a 10 mm joint works out to about 59.26 bricks per square meter; a larger joint or a bigger brick would lower that rate.
What's the difference between specified and nominal brick size?
Specified (or actual/physical) size is the brick's real measured dimensions. Nominal size, used for some other masonry units, already has an assumed mortar joint built into the number. This calculator always uses specified dimensions and adds your joint separately, so the joint is never double-counted or missed.
Do I add the mortar joint to the brick size?
Yes — this calculator's presets show the brick's own specified size, and the mortar joint is a separate, always-editable input added on top of it. Never add a joint on top of a nominal (already joint-inclusive) size, since this calculator doesn't use that convention.
How do I subtract doors and windows?
Add each opening's width, height, and quantity inside its wall using "Add opening." The calculator multiplies width × height × quantity for area and subtracts the total from that wall's gross area automatically.
Does running bond vs. stack bond change the brick count?
No — both use the same brick quantity in this calculator, since offsetting the coursing pattern doesn't change how much wall face one brick covers. Bonds that include header courses (bricks turned to show their end), such as English or Flemish bond, are different — see the next question.
Why doesn't this calculator have an English or Flemish bond option?
Header-containing bonds change brick and mortar quantities, but the correct correction factor depends on your specific brick's proportions and wall construction — applying a generic factor could be wrong for your brick. Selecting "Other / header bond" shows a note instead of guessing, so you can adjust with your bond's specific layout or your mason's guidance.
What does "two wythes" mean, and does it just double the bricks?
A wythe is one continuous vertical layer of brick. This calculator's "two wythes" option doubles the single-wythe brick quantity for two independent layers — a simplified estimate. A real bonded multi-wythe wall, tied together with header courses or wall ties, can need a different quantity than a simple ×2.
How much extra should I order?
5% is an editable, commonly used starting point for cuts, breakage, and project variation — not a universally correct figure. More complex cuts or layouts may warrant a higher allowance.
How much mortar do I need, and is it exact?
The mortar section gives an approximate geometric estimate — the mortar-sized gap around each brick, times the calculated brick count before waste — clearly labeled as approximate. It doesn't model frogs, perforations, header-bond cross joints, or collar joints, and it doesn't prescribe a mortar type or mix ratio. For bag count, enter your product's stated mixed yield rather than relying on bag weight.

Related Calculators